As a follow up. I used this form UK Power Networks G83 Notification. Put “n/a (self install)” for qualification, links to the microinverter certifications (in the comments section) and attached a simple circuit diagram. Emailed it to the address at the top and it came back approved within a week. Very straight forward in the end.
1 Like