Yes, I totally agree with you. And looking at my historical data, most of the vampire loads are on Phase B, anyways. I just need to switch one circuit from A to B, what draws about 30-35W 24/7.
Yes, I totally agree with you. And looking at my historical data, most of the vampire loads are on Phase B, anyways. I just need to switch one circuit from A to B, what draws about 30-35W 24/7.