From the IET article linked to in Robert’s post:
BS 7671:2018+A1:2020 generally requires a resistance value of less than 200 ohms,
Does this standard require that the installation be checked over a period of time to ensure the resistance does not increase above this threshold? I’m thinking about a scenario where the ground is very wet when the earthing electrode is installed.