@Bill.Thomson here’s the photo (it’s a bit blurry) and the text -

[Owner of the photo requested it was deleted - BPO]

Look at the meter security tab you will see a thin wire that has heat shrink over it, if you look further along you will see the start of the shielded coax. This then travels up the wall to a hole in the ceiling and into the roof void and above the insulation on the ceiling. The other end is also exposed by the 17cm. The exposed measurement is what makes sure it received the correct signal.

[The occupier of the premises advises that the 1.5 mm² wires disappearing off to the left are temporary, put there by the Distribution Network Operator and are connected to their voltage monitor. Moderator (RW)]