ASHP frost protection using a portable power pack

The average home owner or tenant will not be refilling a pressurised system themselves will they? It is not difficult to do and they could be given instructions in an emergency over the phone provided tools were available but it is not a normal thing. (think retired couple or someone living on their own in a remote location)

I’m inclined to agree with @designerguy. If there’s just a low flow trip showing on the display (many circuits don’t have a low pressure alarm), I suspect that the majority of owners would just get on the phone to their installers as diagnosis is not necessarily obvious. Even the circuit recharge may not be problem-free for a lay person, e.g. getting rid of multiple airlocks.

Really depends on the type of AFV, you have some that look at outside air temp (avoid) and others take reference from the actual water temp to determine if there is a need to open.

I expect my tenants to top up presure and check all radators for leaks etc, if required I can use a WhatsApp video call to help them. I consider it to come under “tenant like behaviour”. Likewise with defrosting condensation pipes.

But since stopping using letting agents I can choose more able tenants.

I have tried to check how long it would take anti freeze valves to be triggered after a power outage, specifically for the type that senses the water temperature inside the pipe.
ASHP feed pipes with a minimum 50mm insulation will start the process of ice formation (1%) inside the pipe when the air temperature is -5C after approximately 7 hours. This is assuming the flow stops completely due an outage i.e no convection. The anti-freeze valves should trigger some time before that as they are set +3 deg C pipe water temperature. This would mean operating the circulation pump overnight in an outage to avoid a system refill, either by manual or automatic means.

Interesting that the full freezing process takes much longer, 10% freezing of the pipe takes approximately 13 hours and the 50% level takes approximately 30 hours. That is similar to the length of time I was told that PHE damage is likely to occur after a power outage at -5C. This is possibly 20 hours after the AFV is triggered.
Water Regs UK Limited - Pipe Insulation Tool
Lots of assumptions here and it will vary for individual installations of course -so this is not advice…